Stories you shouldn’t miss:
1. A leading engineering expert who is also an advisor to Caltrans said the agency should replace as many defective bolts on the new Bay Bridge as possible, SFGate reports. The bolts were designed to be too hard and brittle and could snap in an earthquake; 32 of the rods have broken already. Meanwhile, many elected officials are calling for a comprehensive investigation into the Bay Bridge scandal in the wake of the bolt problems and a recent report that the new eastern span appears to be riddled with corrosion problems as well, the SacBee$ reports. And, finally, Governor Jerry Brown acknowledged yesterday that the new $6.3 billion bridge may not be able to open as planned on Labor Day.