Time-Lapse Video and Photos of Bay Bridge Deck Replacement

The football-sized portion of the upper deck on the Bay Bridge that was replaced over the Labor Day weekend using massive hydraulic jacks was well documented. One construction worker posted pictures of the work (and his buds) on Flickr. And the Metropolitan Transportation Commission created this nifty time-lapse video of the engineering feat as well.

Previous articleRising Heat
Next articleTragic Ending
18,645FansLike
12,284FollowersFollow
66,386FollowersFollow

Newsletter sign-up

eLert sign-up

Oakland
few clouds
57 ° F
67.9 °
50.3 °
89 %
0.6mph
20 %
Sat
71 °
Sun
68 °
Mon
68 °
Tue
79 °
Wed
74 °
Support the East Bay Express, local news, donate