Time-Lapse Video and Photos of Bay Bridge Deck Replacement

The football-sized portion of the upper deck on the Bay Bridge that was replaced over the Labor Day weekend using massive hydraulic jacks was well documented. One construction worker posted pictures of the work (and his buds) on Flickr. And the Metropolitan Transportation Commission created this nifty time-lapse video of the engineering feat as well.

Previous articleRising Heat
Next articleTragic Ending
18,638FansLike
0FollowersFollow
67,025FollowersFollow

Newsletter sign-up

eLert sign-up

Oakland
overcast clouds
49.8 ° F
52 °
47 °
87 %
0.8mph
100 %
Sun
61 °
Mon
59 °
Tue
64 °
Wed
61 °
Thu
58 °
Support the East Bay Express, local news, donate